Saturday, January 25, 2025

VDOT’s Weekly Hampton Roads Lane Closures Report for Feb. 18-24

George P. Coleman Memorial Bridge. (Christopher Six/WYDaily)

HAMPTON ROADS — VDOT’s list of full closures of interstates, ramps, bridges and primary roads, and single-lane closures at the bridge-tunnels the week of Feb. 18-24.

Scheduled closures are subject to change based on weather conditions and other factors.

Bridges and Tunnels

Hampton Roads Bridge-Tunnel, I-64:  

  • Mobile, single-lane closure eastbound Feb. 21 from 9 p.m. to 5 a.m.

Monitor-Merrimac Memorial Bridge-Tunnel, I-664: 

  • Alternating, single-lane closures southbound Feb. 18-22 from 9 p.m. to 5 a.m.
  • Alternating, mobile, single-lane closures northbound Feb. 20 from 9 a.m. to 2 p.m.

High Rise Bridge, I-64: 

  • Single-lane closures eastbound Feb. 18-21, including brief, intermittent stoppages Feb. 20-21 from 8 p.m. to 5 a.m.

George P. Coleman Memorial Bridge, Route 17: 

  • Single-lane closures northbound Feb. 21-22 from 9 a.m. to 3 p.m.

HRBT Expansion Project:

Elizabeth River Tunnels (Downtown/Midtown Tunnels):

  • Information from Elizabeth River Tunnels for maintenance schedules and lane closures on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).

I-64

I-64, Southside Widening, High Rise Bridge Expansion:

I-64, Hampton Roads Express Lanes:  

Hampton: 

  • Brief, intermittent stoppages in both directions from LaSalle Avenue to the Hampton River Bridge Feb. 18-22 from 11:59 p.m. to 4 a.m.
  • Full closure of the on-ramp from Settlers Landing Road/Woodland Road to I-64 west Feb. 20 from 9 p.m. to 5 a.m.
  • Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265A), with I-64 west traffic shifted to the I-64 east lanes. View the full traffic alert.

Norfolk:

  • Full closures of the I-64 east and west on- and off-ramps to Tidewater Drive north and south (exit 277) Feb. 18-22 from 8 p.m. to 5 a.m. Not all ramps will be closed at the same time.

Norfolk, Reversible Roadway:

  • Full closure in both directions:
    • Consecutively from 8 p.m. on Feb. 16 until 3 a.m. on Feb. 19
    • Feb. 18-22 from 8 p.m. to 3 a.m.
    • Feb. 19-23 from 9:30 a.m. to 12:30 p.m.
    • Consecutively from 8 p.m. on Feb. 23 until 3 a.m. on Feb. 26

For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.

Related Articles

MORE FROM AUTHOR