Friday, April 19, 2024

VDOT’s Weekly Hampton Roads Lane Closures Report for Jan. 7-13

James River Bridge taken from the Hampton side. (WYDaily/Courtesy VDOT)
James River Bridge taken from the Hampton side. (WYDaily/Courtesy VDOT)

HAMPTON ROADS — VDOT’s list of full closures of interstates, ramps, bridges and primary roads, and single-lane closures at the bridge-tunnels the week of Jan. 7-13.

Scheduled closures are subject to change based on weather conditions and other factors.

Bridges and Tunnels

Hampton Roads Bridge-Tunnel, I-64:  

  • Alternating, mobile, single-lane closures westbound Jan. 8 from 9 p.m. to 5 a.m.

Monitor-Merrimac Memorial Bridge-Tunnel, I-664: 

  • Alternating, single-lane closures southbound Jan. 7-10 from 9 p.m. to 5 a.m.

Berkley Bridge, I-264: 

  • Double-lane closures westbound Jan. 7-13 from as early as 7 p.m. to as late as 6 a.m.

James River Bridge, Route 17: 

  • Single-lane closures and brief, intermittent stoppages in both directions:
    • Jan. 7-10 from 9 p.m. to 5 a.m.
    • Jan. 8-11 from 9 a.m. to 3 p.m.
  • Single-lane closure Jan. 11 from 7 p.m. to 1 a.m.
  • Full extended closure of the James River Bridge from 1 a.m. on Jan. 12 through 5 a.m. on Jan. 16. View the full traffic alert

HRBT Expansion Project:

Elizabeth River Tunnels (Downtown/Midtown Tunnels):

I-64

I-64, Southside Widening, High Rise Bridge Expansion:

I-64, Hampton Roads Express Lanes:  

Hampton: 

  • Brief, intermittent stoppages on I-64 west between Mallory Street (exit 268) and LaSalle Avenue (exit 265A) Jan. 10 from 11:59 p.m. to 4 a.m.
  • Full closure of the off-ramp from I-64 east to Rip Rap Road (exit 265C) continuously from 10 p.m. on Jan. 5 until 5 a.m. on Jan. 8. View the full traffic alert.
  • Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265), with I-64 west traffic shifted to the I-64 east lanes. View the full traffic alert.

Norfolk:

  • Full closure of the ramp from I-564 east to I-64 west Jan. 11 from 7 p.m. to 11 a.m.
  • Full closure of the on-ramp from Tidewater Drive north to I-64 west Jan. 11 from 8 p.m. to 5 a.m.

Norfolk, Reversible Roadway:

  • Full closure in both directions Jan. 8-12 from 9:30 a.m. to 12:30 p.m.

For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.

Related Articles

MORE FROM AUTHOR