
Drivers on Interstate 64 should expect a series of nightly lane closures — and possibly some delays — through the week.
As a result of VDOT’s I-64 widening project certain ramps and lanes will experience closures from Feb. 3-9.
Traffic on I-264 east and west between the Ballentine Boulevard and Rosemont Road exits will be slowed for up to 15 minutes about once per hour between 5 a.m. and 11 a.m. Saturday, Feb. 9- 10, for Dominion Energy power line work over the interstate. Temporary stoppages at the nearby on-ramps will also take place during this time.
Bridges
- James River Bridge (Route 17)
- Alternating single-lane closures north and south, Feb. 4-5, 9 a.m. to 3 p.m.
- High Rise Bridge, (I-64)
- Alternating single-lane closures east and west, Feb. 3, 8 p.m. to 5 a.m.
- Hampton Roads Bridge-Tunnel (I-64)
- Alternating single-lane closures east, Feb. 2-8, 8 p.m. to 5 a.m.
- Alternating single-lane closures west, Feb. 5-7, 8 p.m. to 5 a.m.
- Monitor-Merrimac Memorial Bridge-Tunnel (I-664)
- Alternating single-lane closures south, Feb. 4-9, 8 p.m. to 5 a.m.
Ramps
*Signed detours in place Feb. 3-7 and ramps are closed as early as 7 p.m. to 5 a.m. unless otherwise noted*
- I-64 east and west to Route 60/Busch Gardens (exit 243A)
- I-64 east and west to Route 143 (exit 243B)
- Route 60 on-ramp to I-64 east and west
- I-64 east and west to Route 199 west (exit 242A)
- I-64 east and west to Route 199 east (exit 242B)
- Route 199 east and west on-ramps to I-64 east and west.
- I-64 east and west to Yorktown Road/Jefferson Avenue (exit 247)
- Jefferson Avenue (Route 143) on-ramps to I-64 east and west
- Yorktown Road (Route 238) on-ramp to I-64 east – Feb. 3-7 as early as 8 p.m. to 5 a.m
- Full ramp closure on I-95 north off-ramp to U.S. 58 west – Feb. 5 from 9 a.m. to 3 p.m.
- I-64 east off-ramp to Route 143 – Feb. 4-8 from 9 a.m. to 3 p.m.
- Alternating single-lane closures on I-64 east and west from Colonial Parkway to Lee Hall (exit 247) Feb. 3-8, starting as early as 8 p.m. until 5 a.m eastbound, and as early as 7 p.m. until 5 a.m. westbound.
- Route 143 Merrimac Trail north to I-64 west continues from last week.
Lane closures
- Lane closures under flagger control on Yorktown Road, Penniman Road and Jefferson Avenue at the I-64 overpasses on Feb. 3-9, from 7 p.m. to 6 a.m.
- Single-lane closures on I-64 east and west from Route 199 Lightfoot (exit 234) to Route 199/Humelsine Parkway (exit 242), Feb. 3-8 from 7 p.m. until 5 a.m.
- Lane closures under flagger control on Lakeshead Drive and Colonial Parkway at the I-64 overpasses on Feb.4-8 from 9 a.m. to 3 p.m.
- I-64 single-lane closures both directions between South Military Highway and Battlefield Boulevard, Feb. 4-8 from 7 p.m. to 5 a.m.
- I-95: Alternating lane closures north and south, from Skipper’s Road to U.S. 58, Feb. 4-7 from 9 a.m. to 4 p.m.
For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.

