Drivers in Hampton Roads and the Peninsula can expect closures on water crossings, interstates and notable detours for the week of Jan. 24-30.
This list covers full closures of interstates, ramps, bridges and primary roads, and single-lane closures at the bridge-tunnels and the Coleman, High Rise and James River bridges.
Scheduled closures are subject to change based on weather conditions and other factors.
For information on traffic, maintenance and construction in Hampton Roads, visit Virginia Department of Transportation’s 511 website, download the 511VA smartphone app or dial 511.
Bridges & Tunnels
Hampton Roads Bridge-Tunnel, I-64:
- Alternating, mobile, single-lane closures westbound on Jan. 26 from 9 p.m. to 5 a.m.
Monitor-Merrimac Memorial Bridge-Tunnel, I-664:
- Single-lane closures southbound on Jan. 25-26 as early as 8 p.m. to 5 a.m.
- Single-lane closures northbound on Jan. 27-28 from 9 p.m. to 5 a.m.
- Alternating, mobile, single-lane closures in both directions on Jan. 26 from 9:30 a.m. to 1 p.m
HRBT Expansion Project:
- For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org.
Elizabeth River Tunnels (Downtown/Midtown tunnels):
- Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).
I-64 Widening Segment III Project, York County:
- Single-lane closures on I-64 east and west from Route 199/Lightfoot (Exit 234) to Route 199/Humelsine Parkway (Exit 242) as needed Jan. 24-28 starting as early as 7 p.m. to 5 a.m.
- Lane closures under flagger control on Lakeshead Drive at the I-64 overpasses Jan. 25-28 from 8 a.m. to 4 p.m.
- Lane closures under flagger control on Route 143/Merrimac Trail at the I-64 overpass near Camp Peary (Exit 238) Jan. 28-29 from 8 a.m. to 4 p.m.
- A consecutive, long-term full ramp closure and diversion on the existing Route 199 west on-ramp to I-64 west in Lightfoot continues. Westbound traffic on Route 199 follow detour signage in place directing motorists to a new temporary median crossover to access the Route 199 east on-ramp to I-64 west during the closure.
- A consecutive, long-term full ramp closure on Route 143/Merrimac Trail north to I-64 west continues. Traffic will follow detour signage in place directing motorists to the Route 143 south on-ramp to I-64 west during the closure.
I-64 Express Lanes, Norfolk:
- Full closure of the I-64 Express Lanes in both directions on:
- Jan. 24-30 from 8 p.m. to 3 a.m.
- Jan. 25 from 9-11:30 a.m.
I-64 Southside Widening, High Rise Bridge Expansion:
- Alternating, single-lane closures on I-64 in both directions between South Military Highway (Exit 297) and Greenbrier Parkway (Exit 289):
- Jan. 25-28 from 7 p.m. to 5 a.m.
- Jan. 29 from 9 p.m. to 7 a.m.
- Jan. 30 from 8 p.m. to 9 a.m.
- Jan. 31 from 8 p.m. to 5 a.m.
- Click here full list of project traffic alerts.
I-64 / I-264 Interchange Improvements Project, Norfolk/Virginia Beach:
- Single-lane closure on I-64 east at the I-264 interchange on Jan. 24-29 from 7 p.m. to 5 a.m.
- Alternating, multi-lane closures in both direction of I-264 from Newtown Road (Exit 15) to Witchduck Road (Exit 16) on Jan. 24-30 from 7 p.m. to 5 a.m., with two lanes closed no earlier than 9 p.m.
- Alternating, double-lane closures on I-264 west from Witchduck Road (Exit 16) to Newtown Road (Exit 15) beginning on Jan. 29 at 7 p.m. through Jan. 31 at 5 a.m.
- Ongoing closure with detour of a portion of Winwood Drive at eastbound Laskin Road (on the southside of Laskin Road). Click here for the full traffic alert.
- Full closure of Route 301 (Skippers Road) in both directions from the North Carolina state line to Moore’s Ferry Road (Route 629) near Emporia on Jan. 23 at 8 a.m. through Jan. 24 at 8 p.m. Click here for the full traffic alert.