HAMPTON ROADS — VDOT’s list of full closures of interstates, ramps, bridges and primary roads, and single-lane closures at the bridge-tunnels the week of March 3-9.
Scheduled closures are subject to change based on weather conditions and other factors.
Bridges and Tunnels
Hampton Roads Bridge-Tunnel, I-64:
- Single-lane closures westbound March 4-6 from 9 p.m. to 5 a.m.
Monitor-Merrimac Memorial Bridge-Tunnel, I-664:
- Alternating, single-lane closures in both directions March 3-7 from 9 p.m. to 5 a.m.
- Alternating, mobile, single-lane closures southbound March 5 and March 7 from 9 a.m. to 2 p.m.
HRBT Expansion Project:
Elizabeth River Tunnels (Downtown/Midtown Tunnels):
- Information from Elizabeth River Tunnels for maintenance schedules and lane closures on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).
I-64
I-64, Southside Widening, High Rise Bridge Expansion:
- Information about lane closures and other project impacts related to the I-64 Southside Widening and High Rise Bridge Project.
I-64, Hampton Roads Express Lanes:
- Information about lane closures and other project impacts related to the Hampton Roads Express Lanes.
Hampton:
- Full closure of the off-ramp from I-64 east to Settlers Landing Road/Woodland Road (exit 267A) March 4-6 from 10 p.m. to 5 a.m.
- Brief, intermittent stoppages on I-64 in both directions between LaSalle Avenue (exit 265) and the Hampton River Bridge March 3-7 from 11:59 p.m. to 4 a.m.
- Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265), with I-64 west traffic shifted to the I-64 east lanes. View the full traffic alert.
Norfolk:
- Left turn prohibited from southbound Little Creek Road to I-64 east
- Left turn prohibited from the I-564 east off-ramp to northbound Little Creek Road
- Long-term traffic shift toward the inside median on I-64 in both directions between Tidewater Drive and Little Creek Road (exit 276)
- Long-term, continuous, single-lane closure on the I-64 west on-ramp to I-564 west
- Long-term, shortened merge area at the northbound Tidewater Drive on-ramp to I-64 west. View the full traffic alert here.
Norfolk, Reversible Roadway:
- Full closure in both directions:
- Consecutively from 8 p.m. on March 1 until 3 a.m. on March 4
- March 4-7 from 8 p.m. to 3 a.m.
- March 4-8 from 9:30 a.m. to 12:30 p.m.
For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.