HAMPTON ROADS — VDOT’s list of full closures of interstates, ramps, bridges and primary roads, and single-lane closures at the bridge-tunnels the week of Jan. 14-20.
Scheduled closures are subject to change based on weather conditions and other factors.
Bridges and Tunnels
Hampton Roads Bridge-Tunnel, I-64:
- Alternating, mobile, single-lane closures westbound Jan. 17 from 9 p.m. to 5 a.m.
Monitor-Merrimac Memorial Bridge-Tunnel, I-664:
- Alternating, mobile, single-lane closures northbound Jan. 16 from 9 p.m. to 5 a.m.
- Alternating, single-lane closures southbound Jan. 16-18 from 9 p.m. to 5 a.m.
James River Bridge, Route 17:
- Full extended closure of the James River Bridge from 1 a.m. on Jan. 12 through 5 a.m. on Jan. 16. View the full traffic alert
- Brief, intermittent stoppages in both directions:
- Jan. 16-19 from 9 a.m. to 3 p.m.
- Jan. 16-18 from 9 p.m. to 5 a.m.
- Alternating, mobile, single-lane closures in both directions Jan. 17-18 from 9 a.m. to 3 p.m.
George P. Coleman Memorial Bridge, Route 17:
- Alternating, mobile, single-lane closures in both directions Jan. 16 from 9 a.m. to 3 p.m.
HRBT Expansion Project:
Elizabeth River Tunnels (Downtown/Midtown Tunnels):
- Information from Elizabeth River Tunnels for maintenance schedules and lane closures on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).
I-64
I-64, Southside Widening, High Rise Bridge Expansion:
- Information about lane closures and other project impacts related to the I-64 Southside Widening and High Rise Bridge Project.
I-64, Hampton Roads Express Lanes:
- Information about lane closures and other project impacts related to the Hampton Roads Express Lanes.
Hampton:
- Brief, intermittent stoppages on I-64 west between Mallory Street (exit 268) and LaSalle Avenue (exit 265A) Jan. 16-17 from 11:59 p.m. to 4 a.m.
- Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265A), with I-64 west traffic shifted to the I-64 east lanes. View the full traffic alert.
Norfolk, Reversible Roadway:
- Full closure in both directions:
- from 6 p.m. on Jan. 12 to 7 p.m. on Jan. 13
- Jan. 16-19 from as early as 8 p.m. to 3 a.m.
- Jan. 17-20 from 9:30 a.m. to 12:30 p.m.
- Jan. 20 from 9 p.m. to 4 a.m.
For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.