Monday, January 13, 2025

VDOT’s Weekly Hampton Roads Lane Closures Report for Jan. 14-20

George P. Coleman Memorial Bridge. (Christopher Six/WYDaily)

HAMPTON ROADS — VDOT’s list of full closures of interstates, ramps, bridges and primary roads, and single-lane closures at the bridge-tunnels the week of Jan. 14-20.

Scheduled closures are subject to change based on weather conditions and other factors.

Bridges and Tunnels

Hampton Roads Bridge-Tunnel, I-64:  

  • Alternating, mobile, single-lane closures westbound Jan. 17 from 9 p.m. to 5 a.m.

Monitor-Merrimac Memorial Bridge-Tunnel, I-664: 

  • Alternating, mobile, single-lane closures northbound Jan. 16 from 9 p.m. to 5 a.m.
  • Alternating, single-lane closures southbound Jan. 16-18 from 9 p.m. to 5 a.m.

James River Bridge, Route 17: 

  • Full extended closure of the James River Bridge from 1 a.m. on Jan. 12 through 5 a.m. on Jan. 16. View the full traffic alert
  • Brief, intermittent stoppages in both directions:
    • Jan. 16-19 from 9 a.m. to 3 p.m.
    • Jan. 16-18 from 9 p.m. to 5 a.m.
  • Alternating, mobile, single-lane closures in both directions Jan. 17-18 from 9 a.m. to 3 p.m.

George P. Coleman Memorial Bridge, Route 17: 

  • Alternating, mobile, single-lane closures in both directions Jan. 16 from 9 a.m. to 3 p.m.

HRBT Expansion Project:

Elizabeth River Tunnels (Downtown/Midtown Tunnels):

  • Information from Elizabeth River Tunnels for maintenance schedules and lane closures on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).

I-64

I-64, Southside Widening, High Rise Bridge Expansion:

I-64, Hampton Roads Express Lanes:  

Hampton: 

  • Brief, intermittent stoppages on I-64 west between Mallory Street (exit 268) and LaSalle Avenue (exit 265A) Jan. 16-17 from 11:59 p.m. to 4 a.m.
  • Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265A), with I-64 west traffic shifted to the I-64 east lanes. View the full traffic alert.

Norfolk, Reversible Roadway:

  • Full closure in both directions:
    • from 6 p.m. on Jan. 12 to 7 p.m. on Jan. 13
    • Jan. 16-19 from as early as 8 p.m. to 3 a.m.
    • Jan. 17-20 from 9:30 a.m. to 12:30 p.m.
    • Jan. 20 from 9 p.m. to 4 a.m.

For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.

Related Articles

MORE FROM AUTHOR