Monday, November 11, 2024

VDOT’s Weekly Hampton Roads Lane Closures Report for Feb. 4-10

The James River Bridge. (Photo by Tom Saunders/ VDOT)

HAMPTON ROADS — VDOT’s list of full closures of interstates, ramps, bridges and primary roads, and single-lane closures at the bridge-tunnels the week of Feb. 4-10.

Scheduled closures are subject to change based on weather conditions and other factors.

Bridges and Tunnels

Hampton Roads Bridge-Tunnel, I-64:  

  • Single-lane closures eastbound Feb. 6-8 from 9 p.m. to 5 a.m.

Monitor-Merrimac Memorial Bridge-Tunnel, I-664: 

  • Alternating, single-lane closures southbound Feb. 5-8 from 9 p.m. to 5 a.m.

James River Bridge, Route 17: 

  • Full extended closure of the James River Bridge from 1 a.m. on Feb. 2 through 5 a.m. on Feb. 6. View the full traffic alert.
  • Single-lane closures and brief, intermittent stoppages in both directions:
    • Feb. 4-8 from 9 p.m. to 5 a.m.
    • Feb. 5-9 from 9 a.m. to 3 p.m.
  • Alternating, mobile, single-lane closures in both directions Feb. 7-8 from 9 a.m. to 3 p.m.

George P. Coleman Memorial Bridge, Route 17: 

  • Alternating, mobile, single-lane closures in both directions Feb. 6 from 9 a.m. to 3 p.m.
  • Brief, intermittent stoppages in both directions Feb. 7-9 from 10 a.m. to noon.

HRBT Expansion Project:

Elizabeth River Tunnels (Downtown/Midtown Tunnels):

  • Information from Elizabeth River Tunnels for maintenance schedules and lane closures on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).

I-64

I-64, Southside Widening, High Rise Bridge Expansion:

I-64, Hampton Roads Express Lanes:  

Hampton: 

  • Brief, intermittent stoppages on I-64 in both directions between the Hampton River Bridge and LaSalle Avenue (exit 265) Feb. 6-8 from 11:59 p.m. to 4 a.m.
  • Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265A), with I-64 west traffic shifted to the I-64 east lanes. View the full traffic alert.

Norfolk:

  • Full closure of the ramp from I-564 east to I-64 west Jan. 23 from 7 p.m. to 7 a.m.
  • Full closure of the on-ramp from Tidewater Drive north to I-64 west Jan. 23 from 8 p.m. to 5 a.m.
  • Full closure of the off-ramp from I-64 west to Tidewater Drive south (exit 277A) Jan. 26 from 10 p.m. to 8 a.m.

Norfolk, Reversible Roadway:

  • Full closure in both directions:
    • Feb. 3-4 from 7 a.m. to 3 p.m.
    • Feb. 4-8 from 8 p.m. to 3 a.m.
    • Feb. 5-9 from 9:30 a.m. to 12:30 p.m.
    • Feb. 9 from 9 p.m. to 9 a.m.

For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.

Related Articles

MORE FROM AUTHOR