Friday, September 13, 2024

VDOT’s Weekly Hampton Roads Lane Closures Report

James River Bridge. (Photo courtesy VDOT)

HAMPTON ROADS — VDOT’s list of full closures of interstates, ramps, bridges and primary roads, and single-lane closures at the bridge-tunnels for the week of Dec. 10-16.

Scheduled closures are subject to change based on weather conditions and other factors.

Bridges and Tunnels

Hampton Roads Bridge-Tunnel, I-64: 

  • Full directional closure Dec. 10 eastbound from 2-3 a.m. and westbound from 3-4 a.m. for routine tide gate testing. View the full traffic alert here.
  • Mobile, single-lane closure eastbound Dec. 14 from 9 p.m. to 5 a.m.

Monitor-Merrimac Memorial Bridge-Tunnel, I-664: 

  • Alternating, single-lane closures from 9 p.m. to 5 a.m.:
    • Northbound Dec. 10-11 and Dec. 13-14
    • Southbound Dec. 11
  • Single-lane closures southbound Dec. 10-14 from as early as 8 p.m. to 5 a.m.

Berkley Bridge, I-264: 

  • Mobile, single-lane closure in both directions Dec. 12 from 8 p.m. to 4 a.m.
  • Double-lane closures westbound Dec. 10 and Dec. 14-17 from as early as 7 p.m. to as late as 6 a.m.

James River Bridge, Route 17: 

  • Brief, intermittent stoppages in both directions:
    • Dec. 10-14 from 9 p.m. to 5 a.m.
    • Dec. 11-15 from 9 a.m. to 3 p.m.
  • Single-lane closures in both directions:
    • Dec. 11-14 from 9 a.m. to 3 p.m.
    • Dec. 11-14 from 9 p.m. to 5 a.m.
  • Alternating, mobile, single-lane closures in both directions Dec. 13-14 from 9 a.m. to 3 p.m.

George P. Coleman Bridge, Route 17: 

  • Alternating, mobile, single-lane closures in both directions Dec. 12-13 from 9 a.m. to 3 p.m.

HRBT Expansion Project:

  • For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org.

Elizabeth River Tunnels (Downtown/Midtown Tunnels):

  • Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).

I-64

Southside Widening, High Rise Bridge Expansion:

Hampton Roads Express Lanes:  

Hampton 

  • Full closure of the off-ramp from I-64 west to Armistead Avenue/LaSalle Avenue (exit 265B) Dec. 11-15 from 10 p.m. to 5 a.m. View the full traffic alert here.
  • Brief, intermittent stoppages on I-64 in both directions near Rip Rap Road Dec. 14 from 11:59 p.m. to 4 a.m.
  • Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265), with I-64 west traffic shifted to the I-64 east lanes. View the full traffic alert here.

Norfolk, Reversible Roadway 

  • Full closure in both directions:
    • from 8 p.m. Dec. 8 until 3 a.m. Dec. 11
    • Dec. 11-15 from 9:30 a.m. to 12:30 p.m.
    • Dec. 11-14 from 8 p.m. to 3 a.m.
    • from 8 p.m. Dec. 15 until 3 a.m. Dec. 18

For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.

Related Articles

MORE FROM AUTHOR